期刊文献+

基建场地下伏采空区剩余沉降量的数值模拟

Numerical Simulation of Residual Subsidence in an Underlying Mining Goaf Area of Capital Construction Site
原文传递
导出
摘要 基建场地下伏采空区剩余沉降量的计算是确定采空区危害程度的一种有效方法。该文应用有限差分数值计算方法对山西阳泉市西沟新村基建下伏采空区剩余沉降量进行计算,经与实测资料和其它方法结果的对比,十分吻合。实践证明,在正确确定采空区覆岩地质力学模型的前提下,应用数值模拟计算采空区剩余沉降量,可获得符合场地实际的有益结果。 The calculation of residual settlement in an underlying mining goaf area of capital construction site is an effective method to determine the hazards grade of mining goaf area.The residual settlement is calculated in an underlying mining goaf area of capital construction site of Xigou new village in Yangquan City by using FDM,through the comparison of the actual data with the results of other methods,the results are consentaneous.Proved by practice,under the premise of right determining the geomechanical model of overlaying rock in mining goaf area,the useful results are in line with the actua site by numerical simulation method to calculate the residual settlement.
出处 《勘察科学技术》 2009年第6期33-35,共3页 Site Investigation Science and Technology
关键词 采空区 剩余沉降量 数值模拟 mining goaf area residual settlement numerical simulation
  • 相关文献

参考文献3

二级参考文献20

  • 1李俊平,彭作为,周创兵,孔建,盛永清,卢忠瑜,陈克钧.木架山采空区处理方案研究[J].岩石力学与工程学报,2004,23(22):3884-3890. 被引量:36
  • 2黄乐亭.村庄压煤开采的技术途径[J].中国煤炭,1996(8):33-35. 被引量:10
  • 3郭广礼,邓喀中,常江.采空区上方建大型建筑物的地基沉降研究[J].中国矿业大学学报,1996,25(2):54-57. 被引量:32
  • 4何国清,矿山开采沉陷学,1991年
  • 5黄乐亭,中国煤炭,1996年,242期,33页
  • 6王金庄,矿山开采沉陷及其损害防治,1995年
  • 7何国清,矿山开采沉陷学,1991年
  • 8孙忠弟.高等级公路下伏空洞勘探、危害程度评价及治理研究报告集[M].北京:科学出版社,2000..
  • 9Jonce C J F P,Spencer W J.The implication of mining subsidence for modem highway structure[A].In:Large Ground Tunnel Movementand Structure Proceedings[C].[s.l.]:University of Wales Cardiff,1977:515—526.
  • 10Jonce C J F P,Rourke T D.Mining subsidence effects on transportation facilities[J].MIS,1988,(7):107—126.

共引文献367