西线一期工程混凝土拱坝与混凝土面板堆石坝坝型比较研究——以热巴坝址为例

The Study of Dam Type Comparison Between Concrete Arch Dam and Concrete Faced Rock-Filled Dam in First Stage of the Western Route Water-Transfer Project——Dam type comparison at Reba dam site
下载PDF
导出
摘要 根据地形、地质条件及当地筑坝材料分析,以热巴坝址为典型代表的西线一期工程其河谷宽高比最小、坝基地质条件最好的高坝坝址,具备修建混凝土拱坝和混凝土面板坝的条件。进一步的研究和论证结果表明,修建混凝土拱坝和混凝土面板坝在技术上都是可行的,混凝土面板堆石坝方案在投资、工期及施工方面,优势明显。 According to the topographical,geological conditions and analysis of local dam materials,Reba dam site,which is one of typical high-dam sites in first stage of the Western Route water-transfer project,has the smallest width-height ratio and the most suitable foundation.Both concrete arch dam and concrete faced rock-filled dam slab are suitable at this site.Further studies and comparisons indicated that both types of dam were technically feasible and concrete faced rock-filled dam had distinct advantage in cost,project period and construction.
出处 《南水北调与水利科技》 CAS CSCD 2009年第6期164-166,共3页 South-to-North Water Transfers and Water Science & Technology
基金 南水北调西线一期工程坝型比较研究专题
关键词 热巴坝址 坝型比较 混凝土面板堆石坝 混凝土拱坝 Reba dam site dam type comparison concrete faced rock-filled dam concrete arch dam
  • 相关文献

参考文献11

二级参考文献6

共引文献117

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部