摘要
太平湾电站为日调节、低水头、大流量水电站,尾水渠淤积后,因水头减小而造成电能损失,本文对此问题进行简要分析,供探讨。
Taipingwan hydropower station is of daily regulation, low head and large flow, thus tailrace sedimentation may cause power loss. This paper discussed this issue, for reference.
出处
《大坝与安全》
2009年第4期23-25,共3页
Dam & Safety
关键词
尾水变化
水头减小
电能损失
防淤
change of tail water
minish of water head
power loss
sedimentation prevention