期刊文献+

山区油库工程平面及竖向设计优化 被引量:1

Plane and Vertical Design Optimization of Oil Depot Project in Mountainous Area
下载PDF
导出
摘要 文章以大连中石油国际储备库北区工程为例,阐述了在高差较大的山区地形基础上进行油库平面及竖向设计的优化方法。利用数学模拟分析的方法进行土方平衡,获得了最佳竖向设计方案;按照优化的结果采用阶梯式的平面及竖向布置、网箱填方边坡防护的技术措施,取得了降低工程投资和缩短施工工期的效果。 Taking the north zone project of CNPC International Oil Storage Depot in Daliang for example, this paper introduces the optimization method of oil depot plane and vertical design in the mountainous area with large height difference. Applying mathematic simulation method for earthwork equilibrium obtains the optimal vertical design scheme, and using stepped plane and vertical configuration as well as the soil fillednet cages for slope protection realizes the target of reducing engineering investment and shortening construction period.
出处 《石油工程建设》 2010年第1期106-108,共3页 Petroleum Engineering Construction
关键词 油库 平面设计 竖向设计 土石方平衡 优化 oil depot plane design vertical design earthwork equilibrium optimization
  • 相关文献

参考文献3

  • 1GB50074-2002.石油库设计规范[S].[S].,..
  • 2GB50187-93.工业企业总平面设计规范[S].[S].,..
  • 3SY/T0048-2000.石油天然气工程总图设计规范[S].[S].,..

共引文献139

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部