摘要
调查了目前深圳市在建工程建筑垃圾管理状况。通过对相关人员开展的问卷调查进行分析,发现建筑施工过程中建筑垃圾的管理仍存在许多问题。分析了问题存在的主要原因,并在此基础上,提出改进建议。
Status of construction and demolition waste management in Shenzhen was investigated. Some problems of construction and demolition waste management during building construction were found out by questionnaire survey for correlative persons. Main causes of the problems were analyzed, and suggestions for improving the situation were put forward.
出处
《环境卫生工程》
2010年第1期6-8,11,共4页
Environmental Sanitation Engineering
基金
建设部软科学研究项目(06-k7-36)
关键词
建筑垃圾
管理现状
建筑施工
问卷调查
construction and demolition waste
management status
building construction
questionnaire survey