摘要
根据高要水文站每年枯水期测潮期间对测潮代表线用ADCP进行的同步验证资料分析,发现测潮代表线所测流量与验证流量系统误差>±15%,需要修改原测潮代表线,同时为了使高要水文站枯水期潮流量更能反映真实流量,有必要对原测潮代表线进行验证修改。
According to the concurrent validation data of Gaoyao Hydrological Station which was obtained by ADCP during and the validation flow the rainless period, the system error of the flow through is more than 15%. The primary tidal represent line must tidal represent line be modified.
出处
《水利科技与经济》
2010年第1期16-18,23,共4页
Water Conservancy Science and Technology and Economy
关键词
测潮代表线
验证修改
潮流量
潮流速
represent line of the tidal measurement
modification
tidal discharge
flow velocity