摘要
结合具体工程实例,进行了基坑支护位移沉降原因分析,提出了具体的处理方案,指出当前深基坑工程较为普遍,合理安排进度计划对于基坑工程质量控制尤为重要。
Combined with specific project case,this paper carries out the cause analysis on displacement and settlement of foundation pit support,brings up specific treatment and points out that because deep foundation pit project are very popular,it is of great importance for foundation pit projects' quality controlling to arrange construction plan and schedule.
出处
《山西建筑》
2010年第7期90-91,共2页
Shanxi Architecture
关键词
基坑
位移
沉降
处理
foundation pit
displacement
settlement
treatment