摘要
通过连续箱梁挂篮施工监理全过程论述,分析了连续箱梁挂篮施工监理中的要点及难点,并结合实践叙述了连续箱梁挂篮施工控制要点,供同行参考。
Through the discussion on the whole course of construction and supervision of hanging baskets of continuous box girders,this paper analyses the key points and difficulties in its course and combine practice elaborates on the key points of its construction controlling for the reference of counterparts.
出处
《山西建筑》
2010年第7期214-215,共2页
Shanxi Architecture
关键词
连续箱梁
挂篮施工
监理
控制要点
continuous box girders
hanging basket construction
supervision
key point controlling