摘要
通过论述吕梁山隧道施工中不同的施工阶段,调整和采用不同的通风方案,动态解决长大隧道施工中的通风排烟难题,重点介绍了方案的选择,机型的配置,取得的效果等。
Through the discussion on tunnel construction in Lvliang mountain during different phase,adjusting and adapting different ventilation schemes and solving the difficulties concerning smoke exhaustion and ventilation in the course of constructing the long and large tunnel in a dynamic way,it focuses on the choice of schemes,the collocation of different equipments and their results.
出处
《山西建筑》
2010年第7期325-326,共2页
Shanxi Architecture
关键词
特长隧道
通风排烟
方案选择
super long tunnel
smoke exhaustion and ventilation
choice of schemes