期刊文献+

斜框构桥顶进施工的顶镐布置分析 被引量:1

Arrangement analysis on jacking construction for oblique frame-shaped bridge
下载PDF
导出
摘要 通过对斜交框构桥与正交框构桥顶进施工的对比,找出两者的不同点,对斜交框构桥顶进时的转动问题进行了受力分析,又对千斤顶布置的三种方式进行了对比分析,并结合工程实例,通过理论计算,解决了斜交框构斜向顶进时的转动问题,使框构桥正确就位。 Through the comparison between the construction technology oblique-crossing frame-shaped bridge and normal-crossing frame-shaped bridge,this paper finds out their differences,carries out force analysis on the rotation in the course of oblique frame-shaped bridge jacking and the contrastive analysis on three ways of arranging the jacking equipments,and combined with project examples,it has solved the rotating problem concerning the jacking of the oblique-crossing frame by theoretical calculation,putting the frame-shaped bridge in the right place.
作者 王旭东
出处 《山西建筑》 2010年第7期327-329,共3页 Shanxi Architecture
关键词 斜框构桥 顶进 千斤顶不对称布置 oblique frame-shaped birdge jacking unsymmetrical arrangement of the jacking equipment
  • 相关文献

参考文献1

二级参考文献2

共引文献9

同被引文献2

  • 1朱健身;陈东杰.城市地道桥顶进施工技术及工程实例[M]北京:中国建筑工业出版社,20062526.
  • 2高大钊;袁聚云.土质学与土力学[M]北京:人民交通出版社,2001143-151.

引证文献1

二级引证文献2

相关作者