摘要
分析了望亭发电厂化学水处理程控系统中存在的设备老化、可靠性低、程控投用率低、功能不完善、HM I上位机死机、信号通讯不畅以及现场电磁阀工作电源压降过大等问题;介绍了程控系统改造方案和实施过程以及改造过程中所涉及的软件程序升级与合并、软硬件模拟测试、分步施工调试等方法;总结了在机组运行过程中实施化水程控PLC系统整体改造的具体方法和经验。
The problems,which were existed in the chemical water processing programmed control system such as the devices were aged,the reliability was low,the availability factor of the programmed control was low,the functions were imperfect,the upper level processor of HMI was crashed,the signal communication was blocked,the supply voltage of the field electromagnetic valve was too low,and others,were analyzed.The reformation scheme of the programmed control system and the implement process of the scheme were introduced.The software upgrading and merging,the software and hardware simulation test and the construction and debug in step mode were described.The concrete methods and experiences of programmed control PLC system reformation of chemical water system during unit operation were summarized.
出处
《华电技术》
CAS
2010年第1期4-7,共4页
HUADIAN TECHNOLOGY
关键词
火电厂运行
化学水处理系统
程控系统改造
改造方案
thermal power plant operation
chemical water processing system
reformation of programmed control system
reformation scheme