瀑布沟水电站宽戗堤截流水工模型试验及应用 被引量:6

Hydraulic condition and engineering practice of river closure with broad-crested banquette
下载PDF
导出
摘要 为大渡河瀑布沟水电站截流工程选择截流方案进行水工模型试验。试验采用宽戗堤截流,设计戗堤顶宽分别为25 m和60 m的两种试验方案。试验结果表明:龙口水面线第二次跌落时,方案1在戗堤下游坡脚线附近形成的舌状体大于方案2,更能充分利用突扩造成的局部水头损失。因此选择方案1作为最终截流方案。其合理性得到了工程实践的验证,具有一定推广价值。 A hydraulic model test was conducted in order to select a reasonable scheme for the river closure project of Pubugou Hydropower Station. We adopted a broad - crested banquette in the model test with two schemes of its crest widths of 25 m and 60 m respectively. The test results show that the tongue - like current formed near dam - toe line in the downstream of the ban- quette in scheme 1 is larger than that in scheme 2 when water surface level at closure gap drops for the second time; therefore, scheme 1 is selected, in which local head loss caused by sudden expansion can be fully used. Scheme 1 has been verified through engineering practice and has a value for popularization.
出处 《人民长江》 北大核心 2010年第2期25-27,共3页 Yangtze River
基金 "十一五"国家科技支撑计划重大项目(2008BAB29B02)
关键词 宽戗堤 截流水力条件 模型试验 瀑布沟水电站 broad - crested banquette hydraulic condition of river closure model test Pubugou Hydropower Station
  • 相关文献

参考文献3

  • 1车清权.大渡河瀑布沟水电站工程截流模型试验研究报告[R].武汉:长江科学院,2004.
  • 2刘力中,杨文俊.大江截流水力学研究综述[J].中国三峡建设,1999,6(5):46-49. 被引量:4
  • 3中华人民共和国国家发展和改革委员会.DL/T5361-2006,水利水电施工导截流模型试验规程[S].北京:中国电力出版社,2007.

二级参考文献2

共引文献3

同被引文献41

引证文献6

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部