摘要
为大渡河瀑布沟水电站截流工程选择截流方案进行水工模型试验。试验采用宽戗堤截流,设计戗堤顶宽分别为25 m和60 m的两种试验方案。试验结果表明:龙口水面线第二次跌落时,方案1在戗堤下游坡脚线附近形成的舌状体大于方案2,更能充分利用突扩造成的局部水头损失。因此选择方案1作为最终截流方案。其合理性得到了工程实践的验证,具有一定推广价值。
A hydraulic model test was conducted in order to select a reasonable scheme for the river closure project of Pubugou Hydropower Station. We adopted a broad - crested banquette in the model test with two schemes of its crest widths of 25 m and 60 m respectively. The test results show that the tongue - like current formed near dam - toe line in the downstream of the ban- quette in scheme 1 is larger than that in scheme 2 when water surface level at closure gap drops for the second time; therefore, scheme 1 is selected, in which local head loss caused by sudden expansion can be fully used. Scheme 1 has been verified through engineering practice and has a value for popularization.
出处
《人民长江》
北大核心
2010年第2期25-27,共3页
Yangtze River
基金
"十一五"国家科技支撑计划重大项目(2008BAB29B02)
关键词
宽戗堤
截流水力条件
模型试验
瀑布沟水电站
broad - crested banquette
hydraulic condition of river closure
model test
Pubugou Hydropower Station