摘要
介绍扬州港江都港区件杂码头地基处理初步设计方案,结合试夯区试验及监测数据,确定强夯处理的设计参数,以指导大面积施工。通过对子堤区试夯检测与分析,将塑料排水板+强夯法调整为强夯置换法,以达到更好的地基处理效果,充分体现了信息化施工的优势和特点。
The preliminary design scheme for ground treatment in general cargo wharf,Jiangdu harbor area, Yangzhou port is presented. By means of testing and monitoring data in dynamic consolidation trial area,the the previous one ,the plastic drainage plate combined with dynamic consolidation construction to the new one, the dynamic construction replacement method in order to get a better ground treatment effect. Such method has fully reflected the advantage and characterization of information construction.
出处
《港工技术》
2010年第1期42-44,共3页
Port Engineering Technology
关键词
地基处理
强夯
强夯置换
信息化施工
ground treatment
dynamic consolidation
dynamic construction replacement
information construction