摘要 随着滁州地区负荷的迅速增长,"十一五"末至"十二五"期间滁州地区电网渐成规模,220 kV环网进一步密集化,同时暴露出局部受电能力不足、运行方式复杂、电磁环网运行存在隐患等问题。针对这些问题,文中对滁州地区骨干网架及地区电网分别进行了远景规划设想,并对电网建设改造提出了建议。 With the rapid load increasement of Hefei area,Chuzhou power grid will be more complex in the future 5-10 years. The more dense 220 kV loop network undress many power grid problems such as the lack of power supply capability of local area,the complexity of operation mode,and the potential operation problem of electromaganetic loop network. For solving these problems,the paper contributed to the future power palnning of 220 kV area grid for Chuzhou area. And the suggestion of grid construciton and grid operation for Chuzhou power grid was also proposed.
作者 张峰 叶彬
出处 《安徽电力》 2009年第4期75-77,共3页 Anhui Electric Power
关键词 滁州电网 发展规划 分层分区 电磁环网 Chuzhou power grid future power palnning delamination and subarea electromaganetic loop network
  • 相关文献

同被引文献6

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部