摘要
介绍了佛山市兴朗大桥主桥施工监控方案和主桥的预拱度值计算。并用两种有限元软件分别建模进行对比分析,为兴朗大桥施工的顺利进行提供依据和保障。
A program of construction monitoring for and the precamber value of the bridge is calculated. the main bridge of Xinglang Bridge is proposed in this paper Comparison analysis has been carried out between two kinds finite element modeling softwares, with the results being used as basis and guarantee for the successful construction of the bridge.
出处
《广东公路交通》
2009年第4期25-28,共4页
Guangdong Highway Communications
关键词
桥梁
施工监控
预拱度
bridge
construction monitoring
precamber value