期刊文献+

联塔分幅斜拉桥塔结构模型试验设计理论与方法研究 被引量:1

Model Test Design of Pylon Structure of Cable-Stayed Bridge with Jointed Pylons and Separated Girders
下载PDF
导出
摘要 甬江特大桥为联塔四索面双幅预应力混凝土主梁斜拉桥,联塔部位承受复杂的弯曲、扭转以及剪切等复合内力传递,两幅桥的受力呈现出耦合状态。为了确保联塔结构的安全可靠,对整个桥塔进行3∶40的缩尺模型试验研究。介绍了模型试验的结构设计和加载方法设计,为今后类似结构试验模型的研制提供参考。 Yongjiang super - large bridge is a jointed pylon cable - stayed bridge with four cable planes and twin separate prestressed concrete girders. The joint part is under the state of combination with torsion, flexure and shear. The forcing state in separate twin bridges is in coupling conditions. In order to assure the safety and credibility of the jointed pylon, the test for the whole pylon is done with a scale of 3 : 40. The structural design and loading methods for the testing model are briefly introduced, which are useful for the design of other similar structure testing model.
出处 《广东公路交通》 2009年第4期37-40,共4页 Guangdong Highway Communications
关键词 斜拉桥 联塔分幅 模型试验 相似理论 cable- stayed bridge jointed pylons and separated girders model test similarity theories
  • 相关文献

参考文献5

二级参考文献20

  • 1孙玲,朱尔玉,苏国明,陈晓忠.钢筋混凝土拱桥悬臂现浇施工控制分析[J].铁道建筑,2004,44(11):26-27. 被引量:4
  • 2张治成,叶贵如,王云峰.大跨度拱桥拱肋线形调整中的扣索索力优化[J].工程力学,2004,21(6):187-192. 被引量:65
  • 3陈常松,颜东煌,田仲初,李学文.岳阳洞庭湖大桥模型动力相似理论分析[J].桥梁建设,2002,32(1):48-51. 被引量:27
  • 4杨康.结构动力学[M].北京:人民交通出版社,1987..
  • 5雷俊卿.桥梁悬臂施工与设计[M].人民交通出版社,1999..
  • 6中华人民共和国行业标准.公路钢筋混凝土及预应力混凝土桥涵设计规范(JTG D62-2004)[S].北京:人民交通出版社,2004.
  • 7李晓斌,胡秋贵,曾勇华,等.大跨度钢筋混凝土拱桥悬臂浇注施工模型试验研究报告[R].成都:西南交通大学结构工程试验中心,2006.
  • 8Marsel Friedl.The construction of large-span concrete arch bridges with cantilevering method using temporary cablestays[Z].Proceedings of the International Conference on bridge,Croatia,2006.
  • 9戴震番.克尔克桥的大跨度混凝土拱桥悬臂法施工.世界桥梁,1982,(4).
  • 10F T K Au,J J Wang,G D Liu.Construction control of reinforced concrete arch bridges[J].Journal of Bridge Engineering,2003,(1).

共引文献85

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部