基于总时差分配的工期索赔研究 被引量:3

Research on Delay Claims Based on Total Float Allocation
下载PDF
导出
摘要 针对项目中的索赔问题,通过界定总时差所有权提出了一种处理工期索赔的新方法——基于总时差分配法。与传统工期索赔方法的实例对比表明,该方法不仅解决了传统方法中的总时差所有权及应用问题,且处理快捷,节省了取证调查时间,减少了发包人和承包人的争议,具有重要的理论价值和应用价值。 The new total float allocation approach to deal with delay claims is proposed by defining the ownership of the total float. Compared with the traditional delay claims method, the result of instance shows that the proposed method solves the issues of the ownership of the total float and its application, saves time for investigation and gathering for evidence, and relieves controversy between contract letting party and contractor, which plays an important role in theoretical significance and application value.
出处 《水电能源科学》 北大核心 2010年第2期122-124,81,共4页 Water Resources and Power
关键词 总时差 总时差所有权 总时差分配 工期索赔 对比分析 total float float ownership float allocation delay claims comparative analysis
  • 相关文献

参考文献9

二级参考文献27

共引文献54

同被引文献52

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部