摘要
文中介绍了利用计算机软件对白莲河抽水蓄能电站阻抗式调压井衬砌液压滑模进行的有限元仿真分析和结构优化设计。该滑模结构经多次优化改进后,其结构达到了便于拆装,施工并节约成本的目的。
The simulation analysis and structural optimized design made on the hydraulic slip form for the lining of the impedance surge shaft of Bailianhe Pumped Storage Hydropower Station based on finite element method are described herein. After the optimization and improvement made on the structure of the slip form for several times, the object of convenient assembly, disassembly and construction of the slip form has been reached with the saving of the construction cost.
出处
《水利水电技术》
CSCD
北大核心
2010年第2期27-30,共4页
Water Resources and Hydropower Engineering
关键词
调压井
滑模
衬砌
有限元法
优化设计
白莲河抽水蓄能电站
surge shaft
slip form
lining
finite element method
optimized design
Bailianhe Pumped Storage Hydropower Station