基于遗传算法的建设工程风险决策多目标优化研究 被引量:4

Study on multi-objective optimization of risk decision in construction project based on genetic algorithm
下载PDF
导出
摘要 在建设工程风险决策过程中,只考虑单个目标因素的决策并不能满足实际工程的要求。为了使决策更加科学、合理,在风险识别和风险评价的基础上,综合考虑包括风险管理成本在内的多个目标因素对决策结果的影响,建立了工程风险多目标决策优化模型,通过多目标遗传算法NSGA-Ⅱ,实现了工程风险决策方案的优化。最后,对优化结果的分析和评价,证明了所建立的模型在解决工程风险决策问题上的有效性和实用性。 In the process of risk decision-making in construction projects, considering only one objective could not satisfy the demand of actual projects. In order to make the decision-making more scientific and logical, a mathematical model for multi-objective decision- making of project risk management was set up based on risk identification and risk assessment. More objectives were considered in the model including risk management cost. The model was developed by a multi-objective genetic algorithm, NSGA- Ⅱ , to achieve the optimization of risk decision-making of construction projects. Analysis and evaluation of the result demonstrated that the method was effective and available in solving risk decision-making problems of construction projects.
作者 袁永博 李丹
出处 《四川建筑科学研究》 北大核心 2010年第1期261-265,共5页 Sichuan Building Science
关键词 项目管理 风险决策 遗传算法 多目标优化 project management risk decision-making genetic aIgorithm multi-objective optimization
  • 相关文献

参考文献6

  • 1冯利军,李书全.效用理论在工程项目风险管理决策中的应用[J].山西建筑,2007,33(26):14-15. 被引量:1
  • 2卢炽烽,袁大祥,刘纳兵.蒙特卡洛模拟在工程项目风险决策中的应用[J].科技情报开发与经济,2007,17(35):164-166. 被引量:6
  • 3Deb K,Aarawal S,Pratap A,et al. A fast elitist nondominated sorting genetic algorithm for multi-objective optimization: NSGA-Ⅱ[A]. Proc of the Parallel Problem Solving from Nature Ⅵ Conf [ C]. Paria, 2000 : 849-858.
  • 4Daisy X M Zheng S. Thomas Ng and Mohan M Kumaraswamy. Applying Pareto Ranking and Niche Formation to Genetic Algorithm- Based Multi-objective Time-Cost Optimization. Journal of Construction Engineering and Management, 2005,131 ( 1 ) : 81-91.
  • 5Kalyanmoy Deb. A Fast and Elitist Multi-objective Genetic Algorithm : NSGA- Ⅱ. IEEE Transactions on Evolutionary Computation, 2002,6 (2) : 182-197.
  • 6Seung H Hart, Du Y Kim, Hyungkwan Kim, Won-Suk Jang. A web-based integrated system for international project risk management [J]. Automation in Construction,2007,17:342-356.

二级参考文献5

共引文献5

同被引文献21

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部