摘要
分析了山西漳泽电力股份有限公司河津发电分公司二期4号机组自动发电控制系统的运行现状,对该机组协调系统和相关的子系统进行控制技术改进和参数优化。针对机组煤质差及部分设备性能原因,设计了非协调方式下自动发电控制系统投运的新控制方式,该控制方式可在各种工况下长期稳定投入,为山西漳泽电力股份有限公司河津发电分公司"竞价上网"提供了必要基础和有利条件。
The running status of the Automatic Generation Control system (AGC) is analyzed of unit 4 in Hejin Branch Company of Zhangze Power Company Co. , Ltd. The control technology is improved and parameter is optimized for unit coordinated system and subsystem. The non-coordinated mode automatic generation control system is newly designed based on the poor coal and equipment performance feature. This system shall be put into operation in any working conditions stably so as to lay a necessary basis and provide favorable conditions for 'competitive bid for regional power plant to the grid' of. Hejin Branch Company of Zhangze Power Company Co. , Ltd.
出处
《山西电力》
2010年第1期61-64,共4页
Shanxi Electric Power
关键词
自动发电控制
直接能量平衡
非协调方式
竞价上网
Automatic Generation Control (AGC)
Direct Energy Balance (DEB) non-coordinated mode competitive bid for regional power plant to the grid