摘要
本文以龙岩市商会大厦桩基工程施工为背景,通过对某桩基事故的处理与分析,介绍了冲孔灌注桩工艺在溶洞、裂隙发育地区施工过程中,由于地质情况复杂或者施工控制不当等情形下造成的问题所采用施工处理措施。
In this paper, the basis of Longyan City Chamber of Commerce Building, construction process as the background of a pile foundation through incident handling and analysis, introduced the pile punching process in cavities in fractured areas in the con- struction process, due to the complex geological conditions or the Construction Control improper design changes and other factors which should be used in cases where the shift, grouting reinforcement weak areas of construction programs; as well as through the pile and pile cap stress analysis stress analysis to introduce the changes and the instability caused by Shouli Bu are issues such as analysis.
出处
《福建建筑》
2010年第2期77-79,84,共4页
Fujian Architecture & Construction