摘要
本文对处于浪溅区的钢筋混凝土构件受Cl-的侵蚀破坏形式进行了分析,介绍了高性能混凝土的工作机理,以及在国电福州江阴电厂配套煤码头栈桥后张预应力空心板中的应用情况。
This paper not only analyzes the Cl^- erosion failure mode for the reinforced concrete members in wave--splashing zone, but also introduces the work mechanisms of high performance concrete (HPC). Finally, this paper discusses the HPC applications on the trestle--bridge's Post--tensioned reinforced hollow slab for the Coal Wharf in Fuzhou Jiangyin National Electric Power Plant.
出处
《福建建筑》
2010年第2期128-129,141,共3页
Fujian Architecture & Construction
关键词
后张预应力空心板
耐久性
高性能混凝土
Post--tensioned reinforced hollow slab
Durability
High performance concrete