摘要
以莆田市城港大道跨木兰溪大桥工程为例,介绍了现浇箱梁施工中满堂支架的设置方案,并对满堂支架各部分进行受力荷载验算,分别阐述了预压及拆除方法,并提出施工时注意事项,以保证工程的质量、安全、进度等。
Taking the bridge project of Chenggang street across Mnlanxi in Putian as an example, the paper introduces the design scheme for full space support in the cast-in-place box girder construction, undertakes the stressed loading calculation in all parts of full space support, illus- trates the prepressure and unloading methods, and points out some precautions, so as to ensure the quality, the sectu-ity and process for the project.
出处
《山西建筑》
2010年第8期156-157,共2页
Shanxi Architecture
关键词
钢管脚手架
满堂支架
荷载
验算
注意事项
steel pipe scaffold, full space support, loading, calculation, points for attention