摘要
以襄渝线安康—梁家坝增建第二线工程新红卫隧道工程为例,介绍了TSP超前地质预报的探测原理、设备以及方法,并结合实际应用阐述了TSP超前地质预报在隧道施工中的重要作用,为今后类似工程施工提供借鉴。
Taking Xinhongwei tunnel engineering in line two project of Ankang-Liangjiaba part in Xiang-Yu line for example, this paper intro- duces the detection principle, equipments and methods of TSP geology prediction and combined with its actual application, elaborates on the its significant role in tunnel construction, which provides reference for similar project in future.
出处
《山西建筑》
2010年第8期337-338,共2页
Shanxi Architecture