摘要
简要介绍了葛洲坝机电安装项目部通过加强合同管理,有效控制项目成本,从而获得了较好的经济效益。
This thesis briefly introduces that Gezhouba Mechanical-Electric Equipment lnstrallation Project Department has achieved good economical benefits through enhancing contract supervision and effective controlling project cost.
出处
《水电与新能源》
2010年第1期4-6,共3页
Hydropower and New Energy
关键词
合同管理
成本控制
抽水蓄能电站
contract supervision
cost control
pumped storage power plant