摘要 该文分析了特大桥梁供配电工程供电和配电的特点,结合黄埔大桥工程的实施案例,详细阐述了中压电能传输系统施工时序合理安排对特大桥梁供配电工程的重要性。实践证明,供配电工程施工时序的合理调配,是特大桥梁工程施工质量、进度、造价控制的一个重要环节。 The article analyzes the characteristics of the power supply and distribution for the overlarge bridge project. Combined with the case of Huangpu Bridge Project, the article sets forth in detail the significance of reasonably arranging the construction sequence of power supply and distribution for the overlarge bridges in the implementation of the middle-voltage electrical energy transmission system. The practice proves that the reasonable rearrangement of construction sequence of power supply and distribution is the important link for the control of construction quality, schedule and construction cost of the overlarge bridge projects.
作者 谢光秋
出处 《城市道桥与防洪》 2010年第1期105-108,共4页 Urban Roads Bridges & Flood Control
关键词 特大桥梁 供配电 中压电能传输 施工时序 探讨 overlarge bridge, power supply and distribution, middle-voltage electrical energy transmission, construction sequence, discussion
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部