摘要 综合考虑3000m水深铺管船用张紧器的工作过程及参数要求,设计液压夹紧系统为管线提供夹紧力并确定液压系统元件参数。利用AMESim软件建立仿真模型,并对液压缸快进、工进、保压、快退四个工作阶段及同步性进行仿真分析,除快进阶段液压缸存在速度波动外,其余三个阶段运行平稳;采用PID控制使液压缸具有良好的同步性,并通过分析液压缸动态特性,对液压系统进行优化。仿真结果表明液压夹紧系统基本满足张紧器工作要求。 With integrated consideration of working process and parameters of tensioner for pipelaying vessel with the water being 3000meters deep, a hydraulic clamping system was designed to clamp pipe, and its components parameters were obtained. The simulating model was created based on AMESim software, then the corresponding simulation of hydraulic cylinder on the stage of fast-forward press pressure maintaining quick return and synchronism was shown, besides the speed fluctuation during the stage of fast-forward, the other three stages were steady, and using PID control, the hydraulic cylinders have good synchronism. According to analysis the Dynamic dynamic characteristics of hydraulic cylinder, hydraulic system was optimized. The results show that the hydraulic clamping system meets the requirements of tensioner.
出处 《系统仿真学报》 CAS CSCD 北大核心 2010年第2期521-527,共7页 Journal of System Simulation
基金 国家863项目(2006AA09A105)
关键词 铺管船用张紧器 液压夹紧系统 AMESIM 仿真 tensioner for pipelaying vessel hydraulic clamping system AMESim simulation
  • 相关文献

参考文献11

二级参考文献47

共引文献456

同被引文献63

  • 1刘欣科.液压支架试验台调高控制系统的研究[J].煤炭科学技术,2007,35(9):62-65. 被引量:9
  • 2刘勋,刘玉,李新有,柏峰,张云飞.液压伺服控制系统的液压弹簧刚度和机械负载刚度耦合特性分析[J].钢铁技术,2012(2):47-54. 被引量:16
  • 3安维胜,田怀文,杨苗.水压双缸同步控制的仿真研究[J].机床与液压,2004,32(10):99-100. 被引量:3
  • 4贺会群.连续油管技术与装备发展综述[J].石油机械,2006,34(1):1-6. 被引量:176
  • 5Mattiazzo G, Mauro S, Guinzio P S. A tensioner simula- tor for use in a pipelaying design too[J] Meehatron- ies, 2009,19(8) : 1280-1285.
  • 6张超.120吨海洋铺管船用张紧器设计与履带系统分析[D].呼和浩特:内蒙古工业大学,2011.
  • 7Marchionni L, Alessandro L, Vitali L. Offshore pipeline installation 3-Dimensional finite element mod- elling[C]//30th International Conference on Ocean, Offshore and Arctic Engineering. Rotterdam.- ASME,2011 :859-867.
  • 8Sten R, Hansen M R, Larsen C M,et al. Force vari- ations on heave compensating system for ultra-deep- water drilling risers [C]//29th ASME International Conference on Ocean, Offshore and Arctic Engineer- ing. Shanghai: ASME, 2010. 1 -10.
  • 9Mattiazzo G, Mauro S, Guinzio P S. A tensioner simulator for use in a pipelaying design tool [ J ]. Meehatronics, 2009, 19(8): 1280-1285.
  • 10Guarize R, Matos N A F, Sagrilo L V S, et al. Neural networks in the dynamic response analysis of sIender marine structures[J]. Applied Ocean Re- search, 2007, 29(4): 191-198.

引证文献9

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部