柘溪水电厂融冰演习试验 被引量:3

Ice-melting trial of Zhexi hydro power plant
下载PDF
导出
摘要 详细介绍了柘溪水电厂2台250MW水轮机组在自并励励磁方式下并列对一条220kV线路进行融冰演习试验的过程,介绍了试验机组和线路的基本情况,采取了安全控制措施,分析了试验过程中遇到的问题及相应采取的对策。本次试验的成功对其他水电厂进行类似操作有一定借鉴作用,可为电网部门节省融冰规划投资提供实际案例依据,同时也开拓了线路融冰的思路。 This paper introduces the process of the ice-melting trial of two 250 MW water turbine generators on 220 kV line in self-static excitation way at the same time in Zhexi Hydro Power Plant, the basic situation of the generators and the line, and the safety control measures adopted. It also analyzes the problems met with in the test and the corresponding solutions. The success of this test may be helpful for other plants in similar tests. It may provide basis for the state grid in saving investment in ice-melting plant. At the same time, it will broaden our mind in ice-melting.
出处 《电力系统保护与控制》 EI CSCD 北大核心 2010年第3期136-139,共4页 Power System Protection and Control
关键词 自并励励磁 融冰 演习 分析 电网 投资 self-static excitation ice-melting trial analysis state grid investment
  • 相关文献

同被引文献57

引证文献3

二级引证文献94

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部