期刊文献+

考虑双重界面滑移的钢套筒植筋系统受力机理有限元分析

FE ANALYSIS ON LOAD TRANSFER MECHANISM OF BONDED REBARS WITH STEEL SLEEVE CONSIDERING SLIP OF TWO INTERFACES
原文传递
导出
摘要 为研究包含双重界面滑移的植筋系统受力机理,对钢套筒植筋系统进行考虑粘结滑移的非线性有限元分析。在钢套筒植筋系统中,由于钢筋和钢套筒均为钢材,材料性能类似,使得植筋胶与钢筋、植筋胶与钢套筒的粘结性能类似,因此胶筋界面和胶筒界面应有相类似的粘结滑移本构关系。利用钢套筒植筋试验研究得到包含胶筋和胶筒两个界面滑移的粘结滑移本构关系,采用均分方法得到钢套筒植筋系统的胶筋界面和胶筒界面独立分离的粘结滑移本构关系,在此基础上对钢套筒植筋系统进行考虑粘结滑移的ANSYS有限元分析。根据有限元分析结果,证明所建立的两个界面的粘结滑移本构关系合理。了解钢套筒植筋系统的粘结滑移受力机理,为进一步认识自由拉拔植筋系统的粘结滑移受力机理提供了基础。 To study the load transfer mechanism of bonded rebars including slip of two interfaces, the bonded rebars system of steel sleeve was studied by nonlinear FE analysis method. In the bonded rebars system of steel sleeve, because the material of steel sleeve is similar to the one of the steel bar, the bond performance between adhesive and steel bar is similar to the one between adhesive and steel sleeve, so that the bond-slip constitutive relationships of steel-adhesive interface and adhesive-sleeve interface are similar. Therefore, according to the bond-slip constitutive relationship including slip of two interfaces which was formed by the experimental research of steel sleeve, the respective and separate bond-slip constitutive relationships of two interfaces were formed by average division. Then by using these two constitutive relationships, the bonded rebars system of steel sleeve was studied by the FE analysis based on the ANSYS program considering slip of two interfaces. According to the analysis result, the bond-sllp constitutive relationships of two interfaces are reasonable, and the load transfer mechanism of the bonded rebars system of steel sleeve is understood, which is the fundamental work in the further cognition of the load transfer mechanism of the bonded rebars system.
出处 《工业建筑》 CSCD 北大核心 2010年第1期92-97,共6页 Industrial Construction
关键词 植筋 粘结滑移 受力机理 有限元 bonded rebars bond-slip load transfer mechanism finite element analysis
  • 相关文献

参考文献3

二级参考文献13

  • 1张建荣,石丽忠,吴进,张欣,张孟威.植筋锚固拉拔试验及破坏机理研究[J].结构工程师,2004,20(5):47-51. 被引量:46
  • 2中华人民共和国国家标准.混凝土结构加固技术规范(送审稿).2004
  • 3上海市工程建设规范(DG/TJ08-003-2000).建筑锚栓抗拉拔、抗剪性能试验方法.2000
  • 4Fuchs W,Eligehausen R,Breen J E.Concrete Capacity Design (CCD) Approach for Fastening to Concrete.ACI Structural Journal,American Concrete Institute,Vol.92,No.1,January-February 1995
  • 5慧鱼集团公司.慧鱼锚栓技术手册(第5版).2004
  • 6中华人民共和国国家标准.《混凝土结构加固技术规范》(送审稿)[S].2004.
  • 7上海市工程建设规范(DG/TJ08-003-2000).建筑锚栓抗拉拔、抗剪性能试验方法[S].2000.
  • 8Fuchs,W.,Eligehausen,R.,Breen,J.E.,Concrete Capacity Design (CCD) Approach for Fastening to Concrete,ACI Structural Journal,American Concrete Institute,1995,92(1):.
  • 9慧鱼集团公司.慧鱼锚栓技术手册[M].2004.
  • 10熊学玉,许立新,胡家智.化学植筋的拉拔试验研究[J].建筑技术,2000,31(6):383-384. 被引量:72

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部