莱钢2~#750m^3高炉中修空料线实践

Practice of Empty Burden Line During the Medium Repair of 750m 3 Blast Furnace
下载PDF
导出
摘要 莱钢2#750m3高炉中修时,停炉前采用大风量,加大出铁口角度,全程高压操作等措施以保证炉况顺行;空料线操作中确保炉顶打水均匀稳定,雾化良好,加强煤气成分和料面的监测,严格上料程序、煤气放散、放渣等环节的操作控制,取得了良好的效果。 During the medium repair of No.2 750m 3 blast furnace of Laiwu iron and steel general works,before the blow down,some measures,such as using great blast,greatening tap angle and high pressure operation in all process,etc,are used for ensuring the smooth operation of blast furnace.During the operation process of empty burden line,because of taking some active measures,such as even feeding water at top,strengthening supervision for gas component and burden surface,strictly controlling feeding burden process and gas expelling,etc,the excellent result is gained.
机构地区 莱芜钢铁总厂
出处 《山东冶金》 CAS 1998年第5期8-10,共3页 Shandong Metallurgy
关键词 高炉 停炉 中修 空料线 炼铁 blast furnace,blow down,medium repair, empty burden line
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部