摘要 采用3种不同修复方案对3个发生严重破坏的钢筋混凝土延性桥墩进行震后快速修复技术研究.试件首先在固定的轴力和侧向反复荷载下进行拟静力试验使之发生弯曲延性破坏,然后分别利用植筋、浇筑套箍、缠绕CFRP等方法对其进行快速修复并重新进行加载试验.试验结果表明,采用不同方案修复的桥墩承载力和延性指标均能得到较好恢复甚至提高,由于内部损伤的存在,修复后桥墩的初始刚度较低;缠绕CFRP修复的试件,由于施工简单,修复效果较好且造价较低,可在工程实际中推广. An experimental study on three severely earthquake damaged ductile RC bridge piers was carried out to evaluate the feasibility of three available rapid repair techniques for bridge piers. The piers were initially severely damaged subjected to pseudo-static cyclic lateral loading while the axial load holded constant. Then the damaged piers were repaired with three different techniques by using additional bars, jacketing and CFRP sheets. The repaired specimens were tested again under the same loads. The results indicate that all the repaired specimens have similar or even more load-carrying capacity and ductile behavior compared with the original ones, and the initial stiffness of all the repaired piers is lower than that of the original ones as a result of the pre-existing damage in the tested piers; the specimen repaired by using CFRP sheets should be used in engineering practice for its simple operation technology, good repair effect and low cost.
出处 《大连理工大学学报》 EI CAS CSCD 北大核心 2010年第1期93-98,共6页 Journal of Dalian University of Technology
基金 国家自然科学基金资助项目(50978042) 国家自然科学基金青年基金资助项目(50308027) 大连理工大学海岸和近海工程国家重点实验室主任基金资助项目(LP0504)
关键词 钢筋混凝土延性桥墩 修复 植筋 套箍 CFRP ductile RC bridge piers repair additional bars jacketing CFRP
  • 相关文献

参考文献14

  • 1王东升,郭迅,孙治国,孟庆利,于德海,李晓莉.汶川大地震公路桥梁震害初步调查[J].地震工程与工程振动,2009,29(3):84-94. 被引量:125
  • 2YAO T H, CHUNG C F. Seismic effect on highway bridges in Chi Chi earthquake [J]. Journal of Performance of Constructed Facilities, 2004, 18(1): 47-53.
  • 3LEHMAN D E, GOOKIN S E, NACAMULI A M, et al. Repair of earthquake-damaged bridge columns [J]. ACI Structural Journal, 2001, 98(2):233-242.
  • 4YOUM K S, LEE H E, CHOI S. Seismic performance of repaired RC columns [J]. Magazine of Concrete Research, 2006, 58(5) :267-276.
  • 5FUKUYAMA K, HIGASHIBATA Y, MIYAUCHI Y. Studies on repair and strengthening methods of damaged reinforced concrete columns [J]. Cement and Concrete Composites, 2000, 22(1):81-88.
  • 6ABOUTAHA R S, ENGELHARDT M D, JIRSA J O, et al. Experimental investigation of seismic repair of lap splice failures in damaged concrete columns [J]. ACI Structural Journal, 1999, 96(2) :297-306.
  • 7CHENG C T, MO Y L, YEH Y K. Evaluation of as-built, retrofitted, and repaired shear-critical hollow bridge columns under earthquake-type loading [J]. Journal of Bridge Engineering, 2005, 10(5): 520-529.
  • 8PHAN V, SAIIDI M S, ANDERSON J, et al. Near-fault ground motion effects on reinforced concrete bridge piers[J]. Journal of Structural Engineering, 2007, 133(7) :982-989.
  • 9王东升,冯启民,翟桐.近断层地震动作用下钢筋混凝土桥墩的抗震性能[J].地震工程与工程振动,2003,23(1):95-102. 被引量:19
  • 10王东升,李宏男,赵颖华,王国新.钢筋混凝土桥墩基于位移的抗震设计方法[J].土木工程学报,2006,39(10):80-86. 被引量:29

二级参考文献54

共引文献193

同被引文献89

引证文献11

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部