期刊文献+

大规模风电对江苏电网规划影响的实证分析 被引量:16

Empirical research on impact of large-scale wind power on Jiangsu power system planning
下载PDF
导出
摘要 随着我国风电的大力发展,准确合理地认识风力发电的特点及其对电力系统规划的影响对电力系统的发展有着重要意义。基于大量的实际运行数据,依据风电运行模拟方法,研究江苏省千万千瓦级风电场出力的相关性及其对规划的影响;分析了风电出力特征曲线对电力系统规划的价值,通过统计和分析,给出了江苏省风电出力的几类典型特征曲线;在分析大规模风电出力波动性的基础上,研究了2020年千万千瓦风电接入江苏后负荷持续曲线的变化及其对系统规划带来的综合影响。通过实证分析,得出了大规模风电接入后对于电力系统规划工作的有益启示。 With the rapid development of large-scale wind power in China, the characteristics of wind power production and the impact of large-scale wind power on power system planning need to be understood carefully and reasonably. Based on a large number of actual operating data, according to the simulation method of the wind power production, the correlation of lO GW wind power of Jiangsu province and its impact on power system planning was studied. The value of retention curve of wind power production on power system planning was analyzed and several types of typical retention curves of wind power production of Jiangsu province were presented. Finally, based on the analysis on fluctuation of wind power production, changes on load duration curve and impacts on power system planning after 10 GW wind power integration in Jiangsu system was checked and studied. Based on the empirical analysis, useful suggestions on power system planning after large scale wind farms integration were obtained.
出处 《中国电力》 CSCD 北大核心 2010年第2期11-15,共5页 Electric Power
关键词 风力发电 电力系统规划 相关性 特征曲线辨识 wind power production power system planning correlation retention curve identification
  • 相关文献

参考文献6

  • 1HANNELE H.The impact of large scale wind farm integration in Nordic countries [ D ]. Espoo, Finland : Helsinki University, 2004.
  • 2HANNELE H.Hourly wind power variations in the Nordic countries [J].Wind Energy, 2005,8 (2) : 173-195,4.
  • 3DOHERTY R,MALLEY M O.A new approach to quantify reserve demand in systems with significant installed wind capacity [J ]. IEEE Transactions on Power Systems, 2005,20 ( 2 ) : 587-595.
  • 4DOHERTY R,DENNY E,MALLEY M O. System operation with a significant wind power penetration [ C ]//IEEE Power Engineering Society General Meeting, 2004:1002-1007.
  • 5雷亚洲.与风电并网相关的研究课题[J].电力系统自动化,2003,27(8):84-89. 被引量:457
  • 6戴慧珠,王伟胜,迟永宁.风电场接入电力系统研究的新进展(英文)[J].电网技术,2007,31(20):16-23. 被引量:97

二级参考文献49

  • 1[1]Brown L. World Wind Generating Capacity Jumps 31 Percent in 2001. http://www.earth-policy.org
  • 2[2]Jenkins N. Embedded Generation (Part 2). Power Engineering Journal, 1996, 5: 233~239
  • 3[3]Feijoo A, Cidras J. Modeling of Wind Farms in the Load Flow Analysis. IEEE Trans on Power Systems, 2000, 15(1): 110~115
  • 4[4]Larsson A. Flicker Emission of Wind Turbines Caused by Switching Operation. IEEE Trans on Energy Conversion, 2002, 17(1): 119~123
  • 5[5]Larsson A. Flicker Emission of Wind Turbines During Continuous Operation. IEEE Trans on Energy Conversion, 2002, 17(1): 114~118
  • 6[6]IEC 1000-3-7. Assessment of Emission Limits for Fluctuating Loads in MV and HV Power Systems. 1996
  • 7[7]Bossanyi E, Saad-Saoud Z, Jenkins N. Prediction of Flicker Produced by Wind Turbines. Wind Energy, 1998, 1(1): 35~51
  • 8[8]Feijóo A, Cidrás J. Analysis of Mechanical Power Fluctuations in Asynchronous WECS. IEEE Trans on Energy Conversion, 1999, 14(3): 284~291
  • 9[9]Saad-Saoud Z, Jenkins N. Models for Predicting Flicker Induced by Large Wind Turbines. IEEE Trans on Energy Conversion, 1999, 14(3): 743~748
  • 10[10]Amaris H, Vilar C, Usaola J, et al. Frequency Domain Analysis of Flicker Produced by Wind Energy Conversions Systems. In: Proceedings of 8th International Conference on Harmonics and Quality of Power System, Vol 2. Athens (Greece): 1998. 1162~1167

共引文献526

同被引文献209

引证文献16

二级引证文献227

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部