预应力锚索施工技术在西藏林芝老虎嘴水电站高边坡加固中的应用 被引量:1

Application of Prestressed Anchor Construction Technique in High Slope Stabilization at Laohuzui Hydropower Station in Lingzhi of Tibet
下载PDF
导出
摘要 西藏林芝老虎嘴水电站在进行导流洞、泄洪洞出口洞脸边坡开挖施工过程中,由于边坡地质条件差、岩层破碎,在边坡下部形成了较大范围的塑性区,边坡变形加大,导致开挖边坡及顶部自然边坡相继产生了一系列的拉裂缝且扩张迅速,导致多次发生较大规模塌方。为确保边坡稳定和施工安全,业主、监理、设计及施工单位四方针对边坡加固制定出切实可行的治理措施,其中采用了大量的预应力锚索对边坡岩体进行了预应力锚固,效果明显。 During slope excavation construction at diversion tunnel and spillway tunnel outlets at Laohuzui hydropower station in Lingzhi of Tibet,a large plastic zone was formed in the lower part of the slope due to poor geological conditions and fractured rock mass with increased slope deformation,resulting in sets of tensile cracks occurring in excavated slope and natural slope at the top.These cracks extended rapidly,causing large scale collapses in many times.In order to ensure slope stability and construction safety,practical treatment measures for slope stabilization were made by four parties concerned,including Owner,Supervisor,Design and Construction units.Large quantities of prestressed anchors were used in slope rock mass for slope stabilization with good results.At present,the slope,diversion tunnel and spillway tunnel are in stable conditions and excavation in dam and powerhouse areas are being carried out on time.
作者 杨华斌
出处 《四川水力发电》 2010年第1期25-29,32,共6页 Sichuan Hydropower
关键词 西藏 老虎嘴水电站 预应力锚索 粘结式锚索 对穿锚索 锚孔固壁灌浆 超张拉 Laohuzui hydropower station in Lingzhi of Tibet prestressed anchors bond anchors opposite anchors consolidation grouting over tension
  • 相关文献

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部