冬季低温期碾压沥青混凝土心墙施工技术 被引量:8

Construction Technology for Roller Compacted Asphalt Concrete Core during Low Temperature Period in Winter
下载PDF
导出
摘要 寒冷地区冬季由于气温低,采用常规施工技术不能进行土石坝的碾压沥青混凝土心墙施工,工程要停工5~6个月,从而延长了工程施工工期。应用冬季低温期碾压沥青混凝土心墙施工技术,能够保证在冬季低温期进行施工,提高了工程施工进度,降低了工程施工成本,进而缩短了工程建设时间。 In cold area,conventional construction technology is not suitable for roller compacted asphalt concrete core of earth and rockfill dam due to low ambient temperature.In these circumstances,construction must be stopped for 5 to 6 months and construction time delayed.Construction technology for roller compacted asphalt concrete core used during low temperature period in winter enables construction to be carried out in cold winter,then accelerates construction progress,reduces construction cost and shorten construction period.
作者 谢晓龙
出处 《四川水力发电》 2010年第1期105-108,共4页 Sichuan Hydropower
关键词 寒冷地区 土石坝碾压沥青混凝土心墙 低温期施工技术 winter in cold area roller compacted asphalt concrete core of earth and rockfill dam low temperature construction technology
  • 相关文献

同被引文献37

引证文献8

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部