摘要
分析新建大型火电机组中钢球磨煤机在制造、安装、运行过程中造成烧瓦的各种因素,针对烧瓦的原因,提出了处理措施,确保机组稳定运行。
This paper gives a particular analysis on the factors that result in heating burn-out from manufacture, in- stallation and operation of middle steel ball coal mill. And preventive measurements to insure steady operation of the unit are also given in this paper.
出处
《青海电力》
2009年第A01期64-66,72,共4页
Qinghai Electric Power
关键词
筒式钢球磨煤机
制造
安装
运行
烧瓦
drum-type steel ball coal mill
manufacture
installation
operation
bearing burn-out