摘要
本文介绍了五强溪船闸二闸首于1996年12月12日~13日进行的原型观测成果与分析.着重从高水头船闸输水系统不恒定流压力瞬态变化和反向弧门流激振动两方面,分析输水廊道突扩体发生空化空蚀的可能性,以及反向弧门流激振动的危害程度,并对其安全运行作出评估.
In this paper,the analysis results of prototype observation data for high lift ship lock in Wuqiangxi hydro project is presented.Emphases are laid on the distribution of hydrodynamic pressure acting on the wall of filling emptying system and flow induced vibration of the reversed tainter gate.The possibility of cavitation and the safety of the gate are assessed.
出处
《水利学报》
EI
CSCD
北大核心
1998年第12期28-33,共6页
Journal of Hydraulic Engineering
基金
国家自然科学基金
长江三峡开发总公司联合资助
关键词
船闸
输水系统
动水压力
反向弧门
流激振动
high lift ship lock, filling emptying system, hydrodynamic pressure, reversed tainter gate, flow induced vibration, prototype observation.