摘要
结合“高垌水利枢纽水工整体模型试验”的研究成果,针对闸坝堰型选择和消能方案两大问题进行了深入的分析论述。经研究推荐低堰三角形分流墩联合消能布置。
Combining with the research achievement on the integral hydraulic model test of the Gaodong WRPP,in view of two big problems of sluice dam weir type selection and energy dissipation plans,the authors analysed and discussed deeply. According to the study ,they recommended low weir triangular bifurcated united energy dissipation arrangement.
出处
《广西水利水电》
1998年第4期14-17,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
联合消能工
消能
水利枢纽
闸
坝
堰
选型
Tuofeng weir, united energy dissipaters, energy dissipation