摘要
针对应用现有分析河流示踪试验数据,确定河流横向扩散系数Dy的矩法时,要求试验河段平均流速u为已知的不足之处,并对其进行改进.应用改进矩法不仅能够计算Dy值,而且也可以计算u值,从而达到减少野外试验工作量的目的.
the improved moment method for determining the transersal dispersivity of river stream with tracer test data is presented in this paper. This method may be applied in the case of average velocity of stream being unknown, and the value of may be computed, so that field test work amount of tracer test may be reduced.
出处
《水电能源科学》
1998年第4期32-35,共4页
Water Resources and Power