集装箱码头同贝同步装卸调度模型与算法 被引量:29

Scheduling model and algorithm of integrating loading and unloading operations in same ship-bay at container terminal
原文传递
导出
摘要 为了提高集装箱码头装卸效率,建立同贝同步装卸调度模型,实现装卸桥在同一贝位内同时进行装船与卸船作业,模型通过优化装卸桥作业序列与出口集装箱积载计划降低装卸桥与龙门吊作业时间。设计了基于双层遗传算法的模型求解方法,利用上层遗传算法搜索装卸桥最优作业序列,下层遗传算法在装卸桥作业序列基础上获得出口集装箱最优积载计划,然后计算龙门吊与装卸桥作业时间,且将结果反馈到上层遗传算法,通过上下层遗传算法的反馈优化调度方案。通过算例对模型与算法进行验证。分析结果表明:同贝同步装卸调度模型可以提高装卸效率9.42%~11.53%,模型与算法有效。 To improve the operation efficiency of container terminal, a scheduling model of integrating loading and unloading operations was developed. By using the model quay cranes could perform loading and unloading operations simultaneously in same ship-bay. The objective of the model was to minimize the operation times of quay cranes and yard cranes by optimizing the stowage plan of outbound containers and the operation sequence of quay cranes. A bi-level genetic algorithm (GA) was designed to solve the model, in which the upper level GA aimed to find the optimal sequence for quay cranes, the lower level GA aimed to find the optimal stowage plan of outbound containers based on the operation sequence of quay cranes, calculate the total operation times of quay cranes and yard cranes, and return the results to upper level GA, so the scheduling plan was optimized by the feedback between upper level GA and lower level GA. Numerical tests were provided to illustrate the model and algorithm. Analysis result indicates that the operation times of quay cranes can reduce by 9. 42%- 11. 53% by using the model, so the model and algorithm are efficient. 2 tabs, 4 figs, 10 refs.
出处 《交通运输工程学报》 EI CSCD 北大核心 2010年第1期88-93,共6页 Journal of Traffic and Transportation Engineering
基金 国家自然科学基金项目(70572104)
关键词 物流工程 集装箱码头 同贝同步装卸 调度模型 logistics engineering container terminal integrating loading and unloading operations in same ship-bay scheduling model
  • 相关文献

参考文献10

  • 1GOODCHILD A V, DAGANZO C F. Double-cycling strategies for container ships and their effect on ship loading and unloading operations[J]. Transportation Science, 2006, 40(4): 473-483.
  • 2GOODCHILD A V, DAGANZO C F. Crane double cycling in container ports: planning methods and evaluation[J]. Trans portation Research Part B: Methodological, 2007, 41 (8) : 875-891.
  • 3王嘉民,何琪敏,李晓鸣.边装边卸流程的系统开发[J].港口装卸,2006(3):1-4. 被引量:7
  • 4曾庆成,杨忠振.集装箱码头卸船作业调度方案的两阶段禁忌搜索算法[J].交通运输工程学报,2007,7(2):109-112. 被引量:12
  • 5BISH E K. A multiple-crane-constrained scheduling problem in a container terminal[J]. European Journal of Operational Research, 2003, 144(1): 83-107.
  • 6LEE D H, WANG H Q, MIAO L X. Quay crane scheduling with noninterference constraints in port container terminals[J]. Transportation Research Part E: Logistics and Transportation Review, 2008, 44(1): 124-135.
  • 7ZENG Qing cheng, YANG Zhong zhen. Integrating simulation and optimization to schedule loading operations in container terminals [J]. Computers and Operations Research 2009, 36(6): 1935-1944.
  • 8LAU H Y K, ZHAO Y. Integrated scheduling of handling equipment at automated container terminals[J]. International Journal of Production Economics, 2008, 112(2): 665 682.
  • 9ZHANG C Q, WAN Y W, LIU J Y, et al. Dynamic crane deployment in container storage yards [ J]. Transportation Research Part B: Methodological, 2002, 36(6): 537-555.
  • 10ZENG Qing-cheng, YANG Zhong-zhen, LAI Lu-yuan. Models and algorithms for muhi crane oriented scheduling method in container terminals [J]. Transport Policy, 2009, 16 ( 5): 271-278.

二级参考文献11

  • 1李建忠.码头堆场龙门起重机动态配置优化模型[J].交通运输工程学报,2005,5(1):70-74. 被引量:7
  • 2Peterkofsky R I,Daganzo C F.A branch and bound solution method for the crane scheduling problem[J].Transportation Research:Part B,1990,24(3):159-172.
  • 3Kim K H.A crane scheduling method for port container terminals[J].European Journal of Operational Research,2004,156(3):752-768.
  • 4Ng W C,Mak K L.Yard crane scheduling in port container terminals[J].Applied Mathematical Modeling,2005,29(3):263-276.
  • 5Ng W C.Crane scheduling in container yards with inter-crane interference[J].European Journal of Operational Research,2005,164(1):64-78.
  • 6Zhang Chu-qian.Dynamic crane deployment in container storage yards[J].Transportation Research:Part B,2002,36(6):537-555.
  • 7Zhang Chu-qian.Storage space allocation in container terminals[J].Transportation Research:Part B,2003,37 (10):883-903.
  • 8Kim K H,Tae P K.A note on a dynamic space-allocation method for outbound containers[J].European Journal of Operational Research,2003,148(1):92-101.
  • 9Preston P,Kozan E.An approach to determine storage locations of containers at seaport terminals[J].Computers & Operations Research,2001,28(10):983-995.
  • 10Nishimura E.Yard trailer routing at a maritime container terminal[J].Transportation Research:Part E,2005,41(1):53-76.

共引文献17

同被引文献252

引证文献29

二级引证文献148

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部