摘要
广州新电视塔主体结构高454m,外框筒钢管柱混凝土浇筑根据工程不同施工阶段的实际情况采用不同方法进行施工,保证了施工进度和质量。
Outer frame tube steel tube columns concrete pouring applied in the Guangzhou New TV Tower which has the 454-meter high host tower body,using different method constution technique according to conditions in different construction stage to ensure construction progress and quality.
出处
《广东土木与建筑》
2009年第11期32-34,共3页
Guangdong Architecture Civil Engineering
关键词
钢管柱
混凝土浇筑
布料杆
steel tube columns
concrete pouring
placing boom