主要从水深、岸滩演变、波浪、泥沙和海冰等几个方面阐述了中国滨海核电厂取水明渠口门的布置原则,并对这几个因素进行了简单的分析。
This paper analyzes the location principle of the gate of water intake channel of nuclear power plants on the coastal sites in China by focusing on several aspects such as water depth, beach evolvement, wave, sand and sea ice, which are fully discussed in this paper.