摘要
对马钢新区的转炉煤气系统进行简要介绍,分析了投运初期存在的问题,并对系统的优化及优化后转炉煤气回收率提升的效果进行了阐述。
The converter gas recovery system of the newly-built area of Maanshan Iron Steel Co.,Ltd was briefly introduced and problems in the initial stage of commissioning were ana-lyzed.Optimization of the system and raising of converter gas recovery after the optimization were presented.
出处
《冶金动力》
2010年第1期23-24,共2页
Metallurgical Power
关键词
转炉煤气
控制工艺
回收率
converter gas
control process
recovery