乘西部大开发东风 建流域控制性工程——百色水利枢纽工程简介 被引量:1

Take the opportunity of western development,construct key river basin control project
下载PDF
导出
摘要 介绍了百色水利枢纽工程的前期工作历程和建管合一取得的综合效益。百色水利枢纽经10年建设,已于2006年基本建成并投入使用,在3年多的运行中,汛期发生了6次洪水,通过科学合理调度,削减洪峰,确保了右江下游城镇和南宁市的防洪安全;枯水期向下游河道共补水61.3亿m3,使右江的水量、水质和航运得到了保证。 An introduction was mede on the preparation work history of Baise Multipurpose Dam Project and the comprehensive benefits of combining construction with management. After 10 years of construction, Boise Multipurpose Dam Project was completed and put into operation in 2006. During the operation period of more than 3 years, 6 times of floods occurred in the flood period. By scientific and proper regulation, the project controlled the flood peak flow and safeguarded the downstream cities and towns, including Nanning City. The Project also supplemented water of 6.13×10^9m^3 into downstream river course, guarantee the water quantity, water quality and navigation of Youjiang River.
出处 《广西水利水电》 2010年第1期93-97,共5页 Guangxi Water Resources & Hydropower Engineering
关键词 流域控制性工程 建管合一 综合效益 百色水利枢纽 Key river basin control project combine construction with management comprehensive benefit Boise Multipurpose Dam Project
  • 相关文献

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部