挖孔桩在朝阳至黑水高速公路中的应用

Application of Excavation Pile in Chaoyang-Heishui Expressway
下载PDF
导出
摘要 丹东至锡林浩特高速公路朝阳至黑水(辽蒙界)段,桥梁基础地层多属于较密实地层且地下水不发达,地质结构稳定,不易产生坍孔,特别适合采用人工挖孔。我们通过钻孔灌注桩和人工挖孔灌注桩的设计理论、施工工艺、工程造价的比较,在工程地质条件允许,优先考虑采用人工挖孔灌注桩方案,取得了良好的经济技术效益。 The stratum of bridge foundations in Chaoyang - Heishui ( boundary of Liaoning and Inner Mongo- lia) section of Dandong to Xilinhaote Expressway are mosdy compact stratum with stable geologic framework and lacking of groundwater, which is not likely to produce hole collapse in construction and is suitable for manual exca- vation. After comparison of design theory, construction techniques and construction cost of cast - in - place pore pile and artificial excavated pore - pile, we found out that if the engineering geology conditions are suitable, artifi- cial excavated pore -pile method will bring better economic benefits.
作者 张玉伟
出处 《北方交通》 2010年第2期74-76,共3页 Northern Communications
关键词 朝黑高速公路 人工挖孔灌注桩 钻孔灌注桩 比较 Chaoyang- Heishui Expressway artificial excavated pore -pile cast- in -place pore pile comparison
  • 相关文献

参考文献3

  • 1朝黑高速公路总监办文件.总监字[2007]07号.
  • 2JGJ94-94.建筑桩基技术规范[S].[S].,..
  • 3JTGD63-2007,公路桥涵地基与基础设计规范[S].

共引文献1262

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部