项目综合风险的模糊评估模型研究

Study on Comprehensive Risk of Project with Fuzzy Assessment Mode
下载PDF
导出
摘要 风险评估是保证项目运营的关键步骤,以往风险评估主要关注项目中单个风险的评估,但是项目中的各风险因素存在相互影响、相互作用的关系。风险评估带有明显的模糊性和主观性,为量化分析项目综合风险,文中引用模糊数学的综合评判法构建项目综合风险的模糊评估模型,并辅之以案例计算分析,为项目综合风险评估提供操作理论基础。 A project may involve a variety of sources of risk. While factors in risk management interact with each other, the traditional risk assessment system is concerned only with a single individual factor, and comprehensive assessment of the risk is not given enough emphasis. The author employs a fuzzy approach to the comprehensive risk assessment of project and gives an example for analysis.
作者 麦强盛
出处 《武汉职业技术学院学报》 2010年第1期37-40,共4页 Journal of Wuhan Polytechnic
关键词 项目 综合风险 模糊评估 project comprehensive risk fuzzy evaluation
  • 相关文献

参考文献4

二级参考文献10

  • 1钱颂迪.运筹学[M].北京:清华大学出版社,1995..
  • 2Tan W L, Gibbons P G. Singapore venture capitalists(VCs) investment evaluation criteria: a re-examination[J]. Small Business Economics, 1999,(13) :9 -26.
  • 3Cooper D F, Chapman C B. Risk Analysis for Large Projects: Model,Methods and Cases[ M]. USA:John Wiley & Sons,1987.
  • 4杨纶标 高英仪.模糊数学原理及应用[M].广州:华南理工大学出版社,2002..
  • 5SEILERRK.Reasoningaboutuncertaintyincertainexpertsystems:implicationsforprojectmanagementapplications犤J犦[].Projectmanagement.1990
  • 6JOHNConlin,ARKADYRetik.TheapplicabilityofprojectmanagementsoftwareandadvancedITtechniquesinconstructiondelaysmitigation犤J犦[].InternationalJournalofProjectmanagement.1997
  • 7刘希宋,曹霞,李大震.风险投资及投资风险评价[J].中国软科学,2000(3):42-46. 被引量:73
  • 8马力,陈学中,原雪梅.高技术产业投资风险的多因素层次模糊综合评判[J].数量经济技术经济研究,2001,18(7):58-61. 被引量:10
  • 9徐宪平.风险投资的风险评价与控制[J].中国管理科学,2001,9(4):75-80. 被引量:41
  • 10孙万林,马贻章.大型工程的风险分析与风险管理[J].国际技术经济研究,1990(3):45-49. 被引量:5

共引文献77

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部