摘要
分析了剥山填海地基上建筑物产生严重不均匀沉降的原因,介绍了采用注浆法对其进行处理的设计与施工。
This paper analyzes the reasons why the serious differential settlements of the buildings constructed on the backfill foundation happened and specific measures of grouting saturated backfill foundation are introduced.
出处
《探矿工程》
1998年第6期11-12,17,共3页
Exploration Engineering(Drilling & Tunneling)