通过某钢厂的应用实例,介绍了顶承静压桩基础托换施工的设计及工艺方法,并进行沉降对比分析。
This paper introduces in detail the design and techniques of top supported jack up pile underpinning construction through an application case in a steel plant, and comparative analysis of subsidence is carried out.
出处
《探矿工程》
1998年第6期13-15,共3页
Exploration Engineering(Drilling & Tunneling)