摘要
研究虚工序的实用画法。本文给出了在绘图时虚工序的程序化的简洁画法,然后又给出了目前人们还没研究的网络调整时的虚工序的实用画法。并进一步给出了“多者先提原则”和“冗余原则”,使之能够大多数情况下不但实用而且能够最优。
This article deals with the practical method instead of the optimal method of drawing a dummy activity.First,the article illustrated the simplest programmed drawing method of a dummy activity.Second,it discussed the practical drawing method,which had not been mentioned worldwide yet,of a dummy activity when adjusting the network chart.Furthermore,it put forward the idea of 'the most,the first principle',and the 'redundency principle',which,in most cases,are not only practical but also optimal.
出处
《系统工程理论与实践》
EI
CSCD
北大核心
1998年第12期35-39,共5页
Systems Engineering-Theory & Practice
关键词
虚工序
实用画法
CPM网络
dummy activity
practical drawing method
CPM network