摘要
上海梅山钢铁股份有限公司干熄焦项目为1#、2#焦炉移地大修的配套项目。该项目包括新建1套140 t/h干熄焦装置及1座6 MW的背压式汽轮发电机电站。其相应的配套设施有提升机装置、CDQ工艺除尘及环境除尘地面站、除盐水站、循环水站等。该项目应用了国内外先进的工业自动化控制技术和变频调速传动技术,其电气控制系统在国内属于领先水平,实现了干熄焦操作的自动化控制。
The coke dry quenching (CDQ) system is built for new NO. 1 and NO. 2 complete overhaul of coke oven situ project in Shanghai Meishan iron & steel Ltd. The project contains a 140t/h CDQ system and a 6 MW back pressure turbo-generator power plant. The corresponding facilities includes hoisting shaft, CDQ process dust and environmental dust ground stations, water- desalinate station, water-cycle station, and so on. The advanced technology of automation and frequency transmission technology are ap- plied. Automatic control of CDQ operation was realized.
出处
《冶金丛刊》
2010年第1期25-30,共6页
Metallurgical Collections
关键词
干熄焦
电气控制系统
自动化
coke dry quenching (CDQ)
electric control system
automation