期刊文献+

城市高架轨道交通建设的前期动迁工程管理 被引量:1

The Management of Removal Project at the Earlier Stage of Urban Elevated Rail Construction
下载PDF
导出
摘要 阐述了城市高架轨道交通建设前期动迁工程管理的重要性及其特殊性.必须建立高效率的动迁工程管理机构,加强专业化管理能力,委托专业性公司进行操作.应进一步改革投资体制,动迁补偿要适应社会发展水平,进一步发展承担动迁工作的专业性公司,强化动迁工作中的廉政建设. Considering the particularity and importance of the management of Removal Project at the earlier stage of urban elevated rail construction, the author argues that an efficient management organ shall be established to strengthen the professional management and entrust specialized companies with responsibility for the Project. The author also insists that the investment system and the compensation for removal losses shall be further reformed to meet the needs of social development, and the establishment of specialized companies as well as the honest administration in the Project be further strengehened.
作者 葛方
出处 《城市轨道交通研究》 1998年第4期71-73,共3页 Urban Mass Transit
关键词 高架铁路 运迁 工程管理 urban mass transit, removal, management of a project
  • 相关文献

同被引文献6

  • 1卓健.法国城市公共交通的发展建设与组织管理[J].国外城市规划,2004,19(5):28-33. 被引量:12
  • 2Schaeffer K H, Elliott Scalar. Access for All:Transportation and Urban Growth[M]. Baltimore, Md, :Penguin, 1975.
  • 3Richmond Jonathan.Simplicity and Complexity in Design of Transportation Systems and Urban Forms[J],Journal of Planning Education and Research. 1998,17(2).
  • 4Hall Peter. The Future of the Metropolis and its Form[J].Regional Studies, 1997,31 (3).
  • 5杨兆升 何显慈.交通运输系统规划-有关理论与方法[M].人民交通出版社,1999..
  • 6周鹤龙.美国大都市区交通规划及其启示[J].国外城市规划,2002,17(5):50-52. 被引量:23

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部